<listing id="xbvzh"><dfn id="xbvzh"></dfn></listing>
        <video id="xbvzh"><big id="xbvzh"><th id="xbvzh"></th></big></video><video id="xbvzh"></video>
          <form id="xbvzh"></form>
        <ruby id="xbvzh"><big id="xbvzh"></big></ruby>
        <ruby id="xbvzh"></ruby>

              <dl id="xbvzh"></dl>
                • (+966) 13-8327600

                • info@acco-sa.com

                Projects

                Foam Kid Fire Fighting Pipe Line-Qatif

                Foam Kid Fire Fighting Pipe Line-Qatif

                • Client
                  MultiLines Construction And Technical Services
                • Duration
                  3months
                • Location
                  Qatif
                • Value
                  650,000.00 SR
                • Year Completed
                  2010
                 
                BULK PLANT-testing and commissioning of gt3 substation electrical equipment’s in hawiay gas plant.
                Includes testing and commissioning of 13.8 kv mv metal glad double-ended switchgears, 4.16 kv mv motor control centers, 480 volts lvmetal clad double-ended switchgears, and power transformer.
                 
                gaz plan

                Categories

                Completed Project

                Can We Help?

                +966 (13) 8327600